SAN DIEGO, March 10, 2011 – San Diego Gas & Electric (SDG&E) and a subsidiary of CSOLAR Development, LLC, a renewable energy company managed by Tenaska Solar Ventures, today announced a 25-year contract for up to 150 megawatts (MW) of solar energy to be generated [...]
The post SDG&E Signs Renewable Power Contract With Tenaska Project That Will Use Locally Produced Solar Modules appeared first on Tenaska.